In the intricate world of construction, immediate safety measures often take precedence, but it's crucial not to overlook residual hazards—those risks that persist even after a project's completion. 

These latent dangers can compromise long-term safety and regulatory compliance, making it essential to address them thoroughly. Proper management and documentation of residual hazards are key components of any Operations and Maintenance (O&M) Manual, ensuring ongoing safety and compliance after the project's handover.

Understanding Residual Hazards in Construction - Definition and Types


Residual hazards refer to the risks that remain on-site after construction activities have concluded. These can include  structural weaknesses, unaddressed environmental conditions, or leftover materials that pose ongoing threats. Understanding and identifying these hazards are vital for maintaining a safe environment post-construction.

Common Sources of Residual Hazards. 
Residual hazards often stem from several sources:

- Incomplete Documentation: Failure to thoroughly document site conditions can leave unnoticed hazards.
- Unused or Leftover Materials: Materials not properly disposed of or secured can create future risks.
- Environmental Changes: Post-construction environmental shifts, such as erosion or settling, can introduce new     hazards.
- Exposure to Harmful Materials: Accidental exposure due to improper cleanup or containment can lead to long-term   health risks.

Even minor oversights in these areas can have significant consequences, highlighting the need for diligent hazard management.

Importance of O&M Manuals in Managing Residual Hazards


O&M manuals are essential tools in managing residual hazards. They provide comprehensive guidelines on safe operations, emergency responses, and ongoing maintenance, which are critical in identifying and mitigating these lingering risks.

Key aspects of an O&M manual related to residual hazards include:
- Operational Guidelines: Ensuring all personnel understand how to safely interact with the site post-construction.
- Emergency Response Procedures: Detailed steps for addressing any hazards that may arise.
- Maintenance Protocols: Regular inspections and upkeep schedules to prevent hazards from escalating.

Legal Requirements for O&M Manual Compliance
Legal compliance mandates that construction projects include up-to-date O&M manuals, which must adhere to local regulations. These documents are crucial in managing residual hazards, as they protect both workers and the environment from potential post-project risks.

Identifying and Assessing Residual Hazards- Methods for Identifying


Identifying residual hazards is a critical yet challenging task that requires a systematic approach:

- Site Inspections: Regular, thorough inspections can reveal hazards that were not apparent during initial evaluations.
- Employee Feedback: Workers on the ground may notice issues that are otherwise overlooked, making their input invaluable.
- Structured Checklists and Surveys: These tools help ensure a comprehensive evaluation of potential hazards.

Risk Assessment Techniques for Residual Hazards - 
Once hazards are identified, assessing their risk is crucial.

Techniques include:

- Qualitative Risk Assessment: Using experience-based judgment to evaluate hazard severity and likelihood.
- Quantitative Risk Assessment: Applying statistical methods to determine the probability and potential impact of identified risks.
- Hazard Matrices: Visual tools that categorize risks by severity and likelihood, helping prioritize mitigation efforts.

These techniques ensure that residual hazards are effectively managed and mitigated.


Mitigation Strategies for Residual Hazards- Engineering Controls



Engineering controls are among the most effective methods for mitigating residual hazards. These measures involve modifying or designing equipment and processes to reduce exposure to risks.

Examples include:
- Guardrails and Barriers: Preventing falls from heights.
- Ventilation Systems: Managing airborne contaminants.
- Automated Systems: Reducing the need for personnel to operate in hazardous areas.

These controls are essential in creating a safer environment and ensuring compliance with safety standards.

Administrative Controls for Residual Hazards

In addition to engineering controls, administrative measures play a vital role. These include:
- Regular Safety Training: Ensuring all staff are aware of potential hazards and safe practices.
- Routine Safety Audits: Proactively identifying and addressing risks.
- Clear Signage and Communication: Reinforcing safety messages through documents and visual aids.

Prioritizing these controls helps foster a culture of safety and vigilance on-site.


Training and Communication for O&M Manual Compliance


Training is crucial for hazard awareness. Workers must understand the risks associated with residual hazards and how to avoid them. Regular training sessions on identifying and managing these hazards can significantly improve site safety and hazard mitigation efforts.

Effective Communication Strategies for Hazard Mitigation-  key to managing residual hazards.

Strategies include:
Regular Safety Meetings: Weekly briefings to discuss current hazards.
- Clear Signage: Using simple, clear signs to highlight potential risks.
- Feedback Channels: Encouraging workers to report hazards fosters a responsive safety culture.

These communication strategies help ensure that residual hazards are continuously monitored and addressed.


Monitoring and Reviewing Residual Hazards - Regular Inspections


Ongoing inspections are critical in identifying new residual hazards that may emerge after the project is completed.

Effective inspection practices include:
- Scheduled Inspections: Regularly scheduled evaluations of site conditions.
- Employee Feedback: Gathering observations from workers to catch hazards that might otherwise go unnoticed.

Continuous improvement is essential to maintaining effective O&M manual compliance.

This can be achieved by:
- Reviewing and Updating Procedures: Regularly revisiting the manual to incorporate the latest industry standards.
- Ongoing Training: Conducting training sessions to keep staff updated on new compliance measures.
- Establishing a Feedback Loop: Allowing workers to contribute to manual improvements based on their on-site experiences.


Residual Hazards Overview


This section outlines the residual hazards that remain on-site following the completion of construction activities. These hazards have been identified during the final inspection and are recorded to ensure ongoing safety for maintenance personnel and site users. Appropriate measures should be taken to mitigate these hazards during future site operations and maintenance activities.

Identified Residual Hazards

  1. Asbestos-Containing Materials (ACMs)

    • Location: Mechanical room and roof insulation.
    • Description: Asbestos was found in certain insulation materials used in the mechanical room piping and roof structure. Although contained, these materials pose a health risk if disturbed.
    • Precautions: Any maintenance or repair work involving drilling, cutting, or demolition in these areas should be conducted by certified asbestos handling professionals. Proper personal protective equipment (PPE) and containment procedures must be employed.
    • Action Required: Labeling of areas containing ACMs has been completed. Monitoring of these materials should be done annually to check for deterioration.

  2. Lead-Based Paint

    • Location: External window frames and interior walls of the basement storage area.
    • Description: Lead-based paint was used on certain window frames and walls. This paint may pose a health hazard if it deteriorates or is disturbed.
    • Precautions: Regular inspections of these surfaces should be performed to identify peeling or chipping paint. When repainting or repairing these areas, only lead-safe work practices should be used.
    • Action Required: Areas have been marked, and lead hazard warning signs have been posted. Any work involving these painted surfaces should be conducted by personnel trained in lead-safe work practices.

  3. Confined Spaces

    • Location: Underground utility vault and storage tanks.
    • Description: Confined spaces such as the utility vault and storage tanks present oxygen-deficient atmospheres and potential exposure to hazardous gases.
    • Precautions: Entry into confined spaces should only be performed by trained personnel following confined space entry protocols, including air quality testing, use of PPE, and standby rescue personnel.
    • Action Required: Maintain confined space signage and ensure that entry permits and proper safety equipment are available and in use.

  4. Electrical Hazards

    • Location: Electrical panels in the main switch room and sub-panels in service areas.
    • Description: Exposed wiring and high-voltage equipment can pose electrical shock and arc flash risks.
    • Precautions: Only qualified electricians should access or perform work on electrical panels. Lockout/tagout procedures must be strictly followed to ensure safety.
    • Action Required: Routine inspections and maintenance of electrical panels and associated wiring should be conducted. Lockout/tagout kits should be available on-site.

  5. Structural Integrity Concerns

    • Location: North exterior wall and roof support beams.
    • Description: Minor cracks have been observed in the north exterior wall, and signs of rust on some roof support beams. While currently stable, these issues may worsen over time and pose a structural risk.
    • Precautions: Regular monitoring and structural assessments should be conducted. Any significant changes or further deterioration must be addressed immediately.
    • Action Required: An annual structural inspection is required to monitor these conditions. If cracks widen or rust progresses, repair work must be scheduled.

 

General Safety Recommendations


- Hazard Communication: All identified hazards should be clearly marked with appropriate signage. Personnel should be briefed on the locations and nature of these hazards during site induction training.

- PPE Usage: Adequate personal protective equipment must be available and used according to the specific hazards present in each area.

- Training: Personnel involved in maintenance or repair work should receive regular training on hazard recognition, safety procedures, and emergency response related to the identified residual hazards.

 

Reporting and Documentation

Any incidents, near misses, or deterioration of identified hazards should be immediately reported to the site safety officer. Proper documentation of such events must be maintained, and corrective actions should be taken promptly to mitigate risks.

 

Want help with your end of project documentation? We have you covered. Denaploy is the Construction Industry’s leading provider of digital handover documentation - principally H&S/O&M manuals, but also including Regulation 38 Fire Report, BREEAM, CIBSE TM31 and similar associated documentation. Find out more here.


  • What are O&M Manuals?

    When any significant building work is undertaken, either as a NewBuild, a Cat A refit (of the basic structure) or a Cat B refit (tenants fittings), it is a legal requirement in the UK that an O&M (Operations and Maintenance) manual be provided as part of the Health & Safety documentation for the building.

    Read More
  • Home User Guides

    It is not only the O&M manuals that are going digital. It is the user guides for apartments too. The requirements of companies such as Paradigm are increasingly to provide detailed bespoke manuals for each apartment.

    Read More
  • Regulation 38 and the 'Golden Thread'

    Regulation 38 what is it? And what does this means for the future of fire safety and preserving the Golden Thread' of information?

    Read More
  • RiDR

    Rapid intelligent Data Retrieval A bespoke search and retrieval system that enables rapid access to all the information collected across multiple O&M manuals. Our objective is to increase the value of these documents beyond Handover.

    Read More
  • O&M manuals for clients with large property portfolios

    Clients with large property portfolios are increasingly determined to take control of the documentation relating to their properties and store them in data base silos with a common access and structure

    Read More
  • Building Long-Term Relationships

    Find out about the benefits of our Framework Agreements

    Read More
  • What are residual hazards?

    Since CDM 2007 there has been an increasing emphasis on providing a residual risks section in the health and safety Manual. Some sub-contractors find this particularly confusing because of the apparent similarity with the risk assessment that they are required to make before they start work.

    Read More
  • New building regulations will be in effect from 15th June 2023

    New Building Regulations require documentary proof that the build quality conforms to the build plan. Photos during the build and increased certification.

    Read More
  • What Makes a Good O&M Manual?

    Our objective is not to create great literature – many manuals are longer than War & Peace. Our aim is to capture large amounts of detail so that any of the wide variety of future users can find what they need whether it be the details of a floor tile that needs replacing following an accident with some inks, or a major overhaul of the Air conditioning.

    Read More
  • Why should you spend on a professional O&M Manual?

    Is it worth the cost? It's a no-brainer justifying our O&M services.

    Read More
  • The Future Homes Standard 2025

    The new Future Homes Standard being introduced will require significant additional information to be collected and documented to pass Building Regulations.

    Read More
  • Information that we need to start creating your Project Manuals

    A quick reference for Project Managers of the information that we need from you to start our work

    Read More
  • End of Project Checklist

    End of Project check list Having put together all the O&M information from all the subcontractors, there are several areas that need to be cross-checked, especially for the inclusion in the H&S file.

    Read More
  • About Us

    In 2019 we celebrated our thirtieth year in business, Denaploy are arguably the Construction Industry’s leading provider of digital O&M documentation.

    Read More
  • The Expectations of Quality in Documentation are Increasing

    Talk to any old time project managers about O&M manuals and you get the same response; a box ticking exercise in which it is only by the most extreme luck that you will find anything useful when you need it. As we move into the digital world everybody has much higher expectations.

    Read More
  • Thinking about printing O&M manuals

    Modern O&M manuals are created as digital documents replete with hyper links, search tools and the type of navigation structures that we have become used to when browsing the internet. Denaploy is one of the leaders in this trend and as a consequence has documented approaching £1bn of construction projects for some of the most demanding customers in the industry.

    Read More
  • As built drawings PDF or DWG?

    The final As Built drawings have always been a critical part of an O&M Manual, and it has always been clear that these need to be the final version of the drawings

    Read More
  • Digital Home User Guides

    People have a right to expect good quality documentation explaining how to use and maintain their property and the old way of throwing a few bits of product literature into a file is no longer acceptable.

    Read More
  • BREEAM

    BREEAM (Building Research Establishment's Environmental Assessment Method)

    Read More
  • What is a CIBSE TM31 Logbook?

    Log books provide a simple, easily accessible summary of a new or refurbished building rather than the detail contained in O & M manuals.

    Read More
  • Construction Bloopers

    This page is dedicated to the construction blooper. It's just a bit of fun and not to be taken too seriously

    Read More
  • BREEAM Meaning: A Deep Dive into Sustainable Building Practices

    Read More
  • Building Regulations for Greener Construction: Progress, Challenges, and the Path to Net Zero by 2030

    Read More
  • Comprehensive O&M Manuals for Schools: Ensuring Safety, Compliance, and Excellence in Education

    Read More
  • Denaploy Achieves Constructionline Gold Accreditation, Elevating Industry Standards

    Read More
  • The Future Homes Standard 2025: Progress, Delays, and the Path Forward

    Read More
  • Understanding The Purpose And Importance Of O&M Manuals

    Read More
  • Creating Effective Operations and Maintenance Manuals for Healthcare Facilities

    Read More
  • From Construction to Handover: Managing Residual Hazards for O&M Manual Compliance

    Read More
  • Understanding Regulation 38

    Read More
  • Constructionline Meet the Buyer Crawley

    Another jaunt for Constructionlines Meet the Buyer event in Crawley

    Read More
  • Denaploy on Tour-Constructionline Meet the Buyer Leeds

    Denaploy on tour again! This time for Meet the Buyer but in Leeds.

    Read More
  • The Nation Mourns for the Queen

    Our longest standing Monarch unfortunately passes away.

    Read More
  • July 2022 Heatwave

    Temperatures soar and hit peak levels here in the U.K.

    Read More
  • Constructionline Meet the Buyer Derby

    Denaploy on tour for Meet the Buyer.

    Read More
  • Denaploy on tour-Ireland's National Construction Summit

    Annual trip to the National Construction Summit in Ireland.

    Read More
  • CIS and VAT reverse charge from 1st March 2021

    Please note that the provision of documentation services provided by Denaploy Limited are specifically excluded from the CIS and therefore the VAT rules applicable from 1 March do not apply. We will therefore continue to apply VAT to our invoices.

    Read More
  • Manuals for Small Projects

    Small Projects in the region of £200k+ can be really difficult for documentation. They are big enough to require careful documentation, but too small to justify the cost involved.

    Read More
  • Denaploy's New Offices

    Denaploy are pleased to announce that we have moved our entire Operations & Maintenance Manuals department into new offices.

    Read More
  • Common pitfalls in preparing O&M Manuals

    Advice to Project managers - 3 Steps to good quality O&M manuals

    Read More
  • Documentation in the event of Covid-19 lockdown

    As we prepare for a Covid-19 lockdown, we need to take simple precautions for the eventual restart whenever it comes. We want to help by collecting as much information as possible on the current status of the project

    Read More
  • Policy update on Covid-19

    The impact of Covid 19 is growing every day, so our response is under constant review. So far it is business as usual apart from lots of working from home.

    Read More
  • Earth day 2022 and Sustainability in construction

    A key talking point at the moment in the construction industry is of course net zero and sustainability.

    Read More
  • Constructionline Gold Member Accreditation for Denaploy

    As far as we are aware we are the only O&M Provider to hold this level of accreditation.

    Read More
  • Denaploy and Kier Unite for RCA Flagship Building

    After working on a large number of projects together Kier and Denaploy unite again for the RCA

    Read More
  • Thousands saved on refrigerators thanks to O&M Manual and RiDr system.

    O&M Manual and RiDr system saves client thousands through refrigerator changes.

    Read More
  • THFC manual - Holding the ace for BASE, MACE and STACE

    Denaploy was appointed by BASE, one of our valued regular clients, to manage the documentation for this major stadium project

    Read More
  • Recent Projects

    Over the last 10 years we estimate that we have documented over £2bn of construction projects for many main contractors and some of the most demanding clients and consultants in the country.

    Read More
  • Denaploy Flashdrives

    One of the reasons O&M manuals are so disparaged is that they are never there when you need them!

    Read More
  • Data Supply Chain - BIM Systems

    One of our clients is a company that builds and fits-out high-end, exclusive homes in some of the most exclusive areas of North London. They approached us to create the O&M manual and User Guide for one of their latest luxury homes for a well-known TV personality who has a penchant for Apple products.

    Read More
  • Dagenham Park C of E School

    A new school built by Laing O’Rourke in record time using Laing O’Rourke’s model for delivering primary and secondary schools, using standardised building components manufactured and assembled at Europe’s leading construction offsite pre-assembly facility

    Read More
  • BSRIA Performance indicators

    O&M manuals have a terrible reputation. If you mention them to most people in the construction industry you’ll be met by a resigned shrug. They are considered a painful legal necessity and an afterthought to the main job of getting the building project completed. Nobody likes doing them and it requires a completely different skill set to those normally expected of a project manager.

    Read More
  • Denaploy Digital O&M Manuals

    About Denaploy and our processes

    Read More
  • O&M Manuals for Schools

    Undertaking projects for schools have some special requirements and these are also reflected in the documentation production

    Read More
  • St Bernard's Hospital

    A new build hospital unit within the Ealing Hospital complex.

    Read More
Accept & Hide

Denaploy Manuals uses cookies to improve your experience. Read our Privacy Policy.