Making manuals that work

Documentation in the event of Covid-19 lockdown

As we prepare for a Covid-19 lockdown, we need to take simple precautions for the eventual restart whenever it comes. We want to help by collecting as much information as possible on the current status of the project, Mar 23, 2020

Some projects are already being mothballed and it is pretty certain that as the lockdown tightens, many more will be over the next few weeks. We will keep this page updated as things develop.

Update 30/03/2020

The lockdown has now taken force and most projects are either winding down or have stopped.  To protect the future of the business we have furloughed many of our staff. However, we are maintaining a Business Support Team so that we are able to continue to support our customers so that those who focus on getting documentation together while working from home can work with us.

25/03/2020

Preparing for the eventual re-opening of your site

As you and subcontractors struggle with the chaos that this will bring, it is worth thinking about what will be useful to have by way of documentation, when it comes to re-opening the site in a couple of months’ time.

Get Project documentation

If people are forced to work from home, it will be a great opportunity to get essential documentation in place.

If the project is near completion, let’s get the O&M manuals as completed as possible even if the final certification and As Builts are not yet ready, all the asset and maintenance information should be available.

For projects that are in mid flow it is more difficult, but a detailed record of what has been installed to date will be really helpful when it comes to re-start; and unfortunately, it is likely that some of the sub-contractors might not be available to help when it comes to a re-start.

This is a really difficult time for all of us in the construction industry and we at Denaploy will do our best to assist in managing the documentation side of the process. Please keep us informed if the project is a victim of the lockdown or any other changes to the expected Handover date.

At present all the Denaploy staff are working from home and delivering an almost normal service.  We are leveraging the technology that we have built up over the years to maintain quality and consistency and can provide online reviews or handover training via desktop screen sharing where ever you are.

Fortunately, nobody has reported sick and despite a few early glitches with our VOIP telephone system, everything is now working as close to normal as these exceptional circumstances allow.

We have a group meeting for everybody (via Zoom) at 9am every morning which lasts for no more than 30 mins; so please avoid calling us during that time.  Normal telephone calls are being diverted to individuals as usual.

Our objective is to maintain our service as long as our clients need us....

I wish all of us good luck and stay healthy.

Stephen Milton

MD

  • What are O&M Manuals?

    When any significant building work is undertaken, either as a NewBuild, a Cat A refit (of the basic structure) or a Cat B refit (tenants fittings), it is a legal requirement in the UK that an O&M (Operations and Maintenance) manual be provided as part of the Health & Safety documentation for the building.

    Read More
  • Home User Guides

    It is not only the O&M manuals that are going digital. It is the user guides for apartments too. The requirements of companies such as Paradigm are increasingly to provide detailed bespoke manuals for each apartment.

    Read More
  • Regulation 38 and the 'Golden Thread'

    Regulation 38 what is it? And what does this means for the future of fire safety and preserving the Golden Thread' of information?

    Read More
  • RiDR

    Rapid intelligent Data Retrieval A bespoke search and retrieval system that enables rapid access to all the information collected across multiple O&M manuals. Our objective is to increase the value of these documents beyond Handover.

    Read More
  • O&M manuals for clients with large property portfolios

    Clients with large property portfolios are increasingly determined to take control of the documentation relating to their properties and store them in data base silos with a common access and structure

    Read More
  • Building Long-Term Relationships

    Find out about the benefits of our Framework Agreements

    Read More
  • What are residual hazards?

    Since CDM 2007 there has been an increasing emphasis on providing a residual risks section in the health and safety Manual. Some sub-contractors find this particularly confusing because of the apparent similarity with the risk assessment that they are required to make before they start work.

    Read More
  • New building regulations will be in effect from 15th June 2023

    New Building Regulations require documentary proof that the build quality conforms to the build plan. Photos during the build and increased certification.

    Read More
  • What Makes a Good O&M Manual?

    Our objective is not to create great literature – many manuals are longer than War & Peace. Our aim is to capture large amounts of detail so that any of the wide variety of future users can find what they need whether it be the details of a floor tile that needs replacing following an accident with some inks, or a major overhaul of the Air conditioning.

    Read More
  • Why should you spend on a professional O&M Manual?

    Is it worth the cost? It's a no-brainer justifying our O&M services.

    Read More
  • The Future Homes Standard 2025

    The new Future Homes Standard being introduced will require significant additional information to be collected and documented to pass Building Regulations.

    Read More
  • Information that we need to start creating your Project Manuals

    A quick reference for Project Managers of the information that we need from you to start our work

    Read More
  • End of Project Checklist

    End of Project check list Having put together all the O&M information from all the subcontractors, there are several areas that need to be cross-checked, especially for the inclusion in the H&S file.

    Read More
  • About Us

    In 2019 we celebrated our thirtieth year in business, Denaploy are arguably the Construction Industry’s leading provider of digital O&M documentation.

    Read More
  • The Expectations of Quality in Documentation are Increasing

    Talk to any old time project managers about O&M manuals and you get the same response; a box ticking exercise in which it is only by the most extreme luck that you will find anything useful when you need it. As we move into the digital world everybody has much higher expectations.

    Read More
  • Thinking about printing O&M manuals

    Modern O&M manuals are created as digital documents replete with hyper links, search tools and the type of navigation structures that we have become used to when browsing the internet. Denaploy is one of the leaders in this trend and as a consequence has documented approaching £1bn of construction projects for some of the most demanding customers in the industry.

    Read More
  • As built drawings PDF or DWG?

    The final As Built drawings have always been a critical part of an O&M Manual, and it has always been clear that these need to be the final version of the drawings

    Read More
  • Digital Home User Guides

    People have a right to expect good quality documentation explaining how to use and maintain their property and the old way of throwing a few bits of product literature into a file is no longer acceptable.

    Read More
  • BREEAM

    BREEAM (Building Research Establishment's Environmental Assessment Method)

    Read More
  • What is a CIBSE TM31 Logbook?

    Log books provide a simple, easily accessible summary of a new or refurbished building rather than the detail contained in O & M manuals.

    Read More
  • Construction Bloopers

    This page is dedicated to the construction blooper. It's just a bit of fun and not to be taken too seriously

    Read More
  • BREEAM Meaning: A Deep Dive into Sustainable Building Practices

    Read More
  • Building Regulations for Greener Construction: Progress, Challenges, and the Path to Net Zero by 2030

    Read More
  • Comprehensive O&M Manuals for Schools: Ensuring Safety, Compliance, and Excellence in Education

    Read More
  • Denaploy Achieves Constructionline Gold Accreditation, Elevating Industry Standards

    Read More
  • The Future Homes Standard 2025: Progress, Delays, and the Path Forward

    Read More
  • Understanding The Purpose And Importance Of O&M Manuals

    Read More
  • Creating Effective Operations and Maintenance Manuals for Healthcare Facilities

    Read More
  • From Construction to Handover: Managing Residual Hazards for O&M Manual Compliance

    Read More
  • Understanding Regulation 38

    Read More
  • Constructionline Meet the Buyer Crawley

    Another jaunt for Constructionlines Meet the Buyer event in Crawley

    Read More
  • Denaploy on Tour-Constructionline Meet the Buyer Leeds

    Denaploy on tour again! This time for Meet the Buyer but in Leeds.

    Read More
  • The Nation Mourns for the Queen

    Our longest standing Monarch unfortunately passes away.

    Read More
  • July 2022 Heatwave

    Temperatures soar and hit peak levels here in the U.K.

    Read More
  • Constructionline Meet the Buyer Derby

    Denaploy on tour for Meet the Buyer.

    Read More
  • Denaploy on tour-Ireland's National Construction Summit

    Annual trip to the National Construction Summit in Ireland.

    Read More
  • CIS and VAT reverse charge from 1st March 2021

    Please note that the provision of documentation services provided by Denaploy Limited are specifically excluded from the CIS and therefore the VAT rules applicable from 1 March do not apply. We will therefore continue to apply VAT to our invoices.

    Read More
  • Manuals for Small Projects

    Small Projects in the region of £200k+ can be really difficult for documentation. They are big enough to require careful documentation, but too small to justify the cost involved.

    Read More
  • Denaploy's New Offices

    Denaploy are pleased to announce that we have moved our entire Operations & Maintenance Manuals department into new offices.

    Read More
  • Common pitfalls in preparing O&M Manuals

    Advice to Project managers - 3 Steps to good quality O&M manuals

    Read More
  • Documentation in the event of Covid-19 lockdown

    As we prepare for a Covid-19 lockdown, we need to take simple precautions for the eventual restart whenever it comes. We want to help by collecting as much information as possible on the current status of the project

    Read More
  • Policy update on Covid-19

    The impact of Covid 19 is growing every day, so our response is under constant review. So far it is business as usual apart from lots of working from home.

    Read More
  • Earth day 2022 and Sustainability in construction

    A key talking point at the moment in the construction industry is of course net zero and sustainability.

    Read More
  • Constructionline Gold Member Accreditation for Denaploy

    As far as we are aware we are the only O&M Provider to hold this level of accreditation.

    Read More
  • Denaploy and Kier Unite for RCA Flagship Building

    After working on a large number of projects together Kier and Denaploy unite again for the RCA

    Read More
  • Thousands saved on refrigerators thanks to O&M Manual and RiDr system.

    O&M Manual and RiDr system saves client thousands through refrigerator changes.

    Read More
  • THFC manual - Holding the ace for BASE, MACE and STACE

    Denaploy was appointed by BASE, one of our valued regular clients, to manage the documentation for this major stadium project

    Read More
  • Recent Projects

    Over the last 10 years we estimate that we have documented over £2bn of construction projects for many main contractors and some of the most demanding clients and consultants in the country.

    Read More
  • Denaploy Flashdrives

    One of the reasons O&M manuals are so disparaged is that they are never there when you need them!

    Read More
  • Data Supply Chain - BIM Systems

    One of our clients is a company that builds and fits-out high-end, exclusive homes in some of the most exclusive areas of North London. They approached us to create the O&M manual and User Guide for one of their latest luxury homes for a well-known TV personality who has a penchant for Apple products.

    Read More
  • Dagenham Park C of E School

    A new school built by Laing O’Rourke in record time using Laing O’Rourke’s model for delivering primary and secondary schools, using standardised building components manufactured and assembled at Europe’s leading construction offsite pre-assembly facility

    Read More
  • BSRIA Performance indicators

    O&M manuals have a terrible reputation. If you mention them to most people in the construction industry you’ll be met by a resigned shrug. They are considered a painful legal necessity and an afterthought to the main job of getting the building project completed. Nobody likes doing them and it requires a completely different skill set to those normally expected of a project manager.

    Read More
  • Denaploy Digital O&M Manuals

    About Denaploy and our processes

    Read More
  • O&M Manuals for Schools

    Undertaking projects for schools have some special requirements and these are also reflected in the documentation production

    Read More
  • St Bernard's Hospital

    A new build hospital unit within the Ealing Hospital complex.

    Read More
Accept & Hide

Denaploy Manuals uses cookies to improve your experience. Read our Privacy Policy.